MainframeMaster

COBOL Tutorial

COBOL Based Data

Progress0 of 0 lessons

Introduction to Based Data in COBOL

Based data in COBOL represents a significant advancement in the language's capabilities, enabling dynamic memory management and sophisticated data structures. This feature allows programs to allocate memory at runtime, create flexible data structures, and manage memory efficiently—capabilities traditionally associated with more modern programming languages.

Based data concepts include:

  • Dynamic Memory Allocation: Allocating memory at runtime
  • Pointer Operations: Using addresses to reference data
  • Linked Data Structures: Creating dynamic lists and trees
  • Memory Management: Efficient allocation and deallocation
  • Advanced Data Organization: Flexible data layouts

Pointer Operations and Address Management

Pointers in COBOL enable programs to work with memory addresses, providing the foundation for dynamic data structures and efficient memory management.

Basic Pointer Operations

cobol
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
IDENTIFICATION DIVISION. PROGRAM-ID. POINTER-OPERATIONS-DEMO. DATA DIVISION. WORKING-STORAGE SECTION. 01 POINTER-VARIABLES. 05 DATA-POINTER USAGE POINTER. 05 WORK-POINTER USAGE POINTER. 05 NULL-POINTER USAGE POINTER VALUE NULL. 01 DATA-ITEMS. 05 STATIC-DATA PIC X(20) VALUE "Static Data Item". 05 DYNAMIC-DATA PIC X(20). 05 POINTER-VALUE PIC 9(8). PROCEDURE DIVISION. DISPLAY "=== Pointer Operations Demonstration ===" PERFORM BASIC-POINTER-OPERATIONS PERFORM POINTER-ARITHMETIC PERFORM POINTER-COMPARISON STOP RUN. BASIC-POINTER-OPERATIONS. DISPLAY "=== Basic Pointer Operations ===" * Get address of static data SET DATA-POINTER TO ADDRESS OF STATIC-DATA DISPLAY "Address of STATIC-DATA obtained" * Copy pointer SET WORK-POINTER TO DATA-POINTER DISPLAY "Pointer copied to WORK-POINTER" * Check for null pointer IF DATA-POINTER = NULL DISPLAY "DATA-POINTER is NULL" ELSE DISPLAY "DATA-POINTER contains valid address" END-IF. POINTER-ARITHMETIC. DISPLAY "=== Pointer Arithmetic ===" * Note: COBOL pointer arithmetic is limited compared to C * but basic operations are supported SET DATA-POINTER TO ADDRESS OF STATIC-DATA DISPLAY "Base address obtained" * Display pointer value (implementation dependent) MOVE DATA-POINTER TO POINTER-VALUE DISPLAY "Pointer value: " POINTER-VALUE. POINTER-COMPARISON. DISPLAY "=== Pointer Comparison ===" SET DATA-POINTER TO ADDRESS OF STATIC-DATA SET WORK-POINTER TO ADDRESS OF DYNAMIC-DATA IF DATA-POINTER = WORK-POINTER DISPLAY "Pointers are equal" ELSE DISPLAY "Pointers are different" END-IF IF DATA-POINTER = NULL DISPLAY "DATA-POINTER is NULL" ELSE DISPLAY "DATA-POINTER is not NULL" END-IF.

Dynamic Memory Allocation

Dynamic memory allocation allows programs to request memory at runtime and release it when no longer needed, enabling flexible data structures and efficient memory usage.

Memory Allocation and Deallocation

cobol
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
IDENTIFICATION DIVISION. PROGRAM-ID. DYNAMIC-MEMORY-DEMO. DATA DIVISION. WORKING-STORAGE SECTION. 01 MEMORY-CONTROL. 05 ALLOCATION-POINTER USAGE POINTER. 05 MEMORY-SIZE PIC 9(6) VALUE 1000. 05 ALLOCATION-STATUS PIC 9(2). 05 ALLOCATION-COUNT PIC 9(3) VALUE ZERO. 01 DYNAMIC-DATA. 05 DYNAMIC-RECORD. 10 RECORD-ID PIC X(10). 10 RECORD-DATA PIC X(50). 10 RECORD-SIZE PIC 9(4). PROCEDURE DIVISION. DISPLAY "=== Dynamic Memory Allocation Demo ===" PERFORM ALLOCATE-MEMORY PERFORM USE-DYNAMIC-MEMORY PERFORM DEALLOCATE-MEMORY STOP RUN. ALLOCATE-MEMORY. DISPLAY "=== Memory Allocation ===" DISPLAY "Requesting " MEMORY-SIZE " bytes of memory" ALLOCATE MEMORY-SIZE CHARACTERS RETURNING ALLOCATION-POINTER ON EXCEPTION DISPLAY "Memory allocation failed" STOP RUN NOT ON EXCEPTION DISPLAY "Memory allocated successfully" ADD 1 TO ALLOCATION-COUNT END-ALLOCATE. USE-DYNAMIC-MEMORY. DISPLAY "=== Using Dynamic Memory ===" IF ALLOCATION-POINTER NOT = NULL DISPLAY "Using allocated memory" MOVE "REC001" TO RECORD-ID MOVE "Dynamic data content" TO RECORD-DATA MOVE 60 TO RECORD-SIZE DISPLAY "Record ID: " RECORD-ID DISPLAY "Record Data: " RECORD-DATA DISPLAY "Record Size: " RECORD-SIZE ELSE DISPLAY "No memory allocated" END-IF. DEALLOCATE-MEMORY. DISPLAY "=== Memory Deallocation ===" IF ALLOCATION-POINTER NOT = NULL FREE ALLOCATION-POINTER DISPLAY "Memory deallocated successfully" MOVE NULL TO ALLOCATION-POINTER ELSE DISPLAY "No memory to deallocate" END-IF.

Linked Data Structures

Based data enables the creation of sophisticated linked data structures such as linked lists, trees, and graphs, providing powerful organizational capabilities.

Linked List Implementation

cobol
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
IDENTIFICATION DIVISION. PROGRAM-ID. LINKED-LIST-DEMO. DATA DIVISION. WORKING-STORAGE SECTION. 01 LIST-NODE. 05 NODE-DATA PIC X(20). 05 NEXT-NODE USAGE POINTER. 01 LIST-CONTROL. 05 HEAD-NODE USAGE POINTER VALUE NULL. 05 CURRENT-NODE USAGE POINTER VALUE NULL. 05 NEW-NODE USAGE POINTER VALUE NULL. 05 NODE-COUNT PIC 9(3) VALUE ZERO. 01 LIST-DATA. 05 DATA-ITEMS OCCURS 5 TIMES. 10 ITEM-VALUE PIC X(20). PROCEDURE DIVISION. PERFORM INITIALIZE-LIST-DATA PERFORM BUILD-LINKED-LIST PERFORM TRAVERSE-LINKED-LIST PERFORM CLEANUP-LINKED-LIST STOP RUN. INITIALIZE-LIST-DATA. MOVE "First Item" TO ITEM-VALUE(1) MOVE "Second Item" TO ITEM-VALUE(2) MOVE "Third Item" TO ITEM-VALUE(3) MOVE "Fourth Item" TO ITEM-VALUE(4) MOVE "Fifth Item" TO ITEM-VALUE(5). BUILD-LINKED-LIST. DISPLAY "=== Building Linked List ===" PERFORM VARYING NODE-COUNT FROM 1 BY 1 UNTIL NODE-COUNT > 5 * Allocate memory for new node ALLOCATE LENGTH OF LIST-NODE CHARACTERS RETURNING NEW-NODE ON EXCEPTION DISPLAY "Failed to allocate node " NODE-COUNT EXIT PERFORM NOT ON EXCEPTION DISPLAY "Allocated node " NODE-COUNT END-ALLOCATE * Set up new node MOVE ITEM-VALUE(NODE-COUNT) TO NODE-DATA SET NEXT-NODE TO NULL * Add to list IF HEAD-NODE = NULL SET HEAD-NODE TO NEW-NODE SET CURRENT-NODE TO NEW-NODE ELSE SET NEXT-NODE OF CURRENT-NODE TO NEW-NODE SET CURRENT-NODE TO NEW-NODE END-IF END-PERFORM. TRAVERSE-LINKED-LIST. DISPLAY "=== Traversing Linked List ===" SET CURRENT-NODE TO HEAD-NODE MOVE 0 TO NODE-COUNT PERFORM UNTIL CURRENT-NODE = NULL ADD 1 TO NODE-COUNT DISPLAY "Node " NODE-COUNT ": " NODE-DATA SET CURRENT-NODE TO NEXT-NODE OF CURRENT-NODE END-PERFORM. CLEANUP-LINKED-LIST. DISPLAY "=== Cleaning Up Linked List ===" SET CURRENT-NODE TO HEAD-NODE PERFORM UNTIL CURRENT-NODE = NULL SET NEW-NODE TO NEXT-NODE OF CURRENT-NODE FREE CURRENT-NODE SET CURRENT-NODE TO NEW-NODE END-PERFORM SET HEAD-NODE TO NULL DISPLAY "Linked list cleaned up successfully".

Advanced Data Structures

Based data enables the implementation of complex data structures such as binary trees, hash tables, and dynamic arrays.

Binary Tree Implementation

cobol
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
IDENTIFICATION DIVISION. PROGRAM-ID. BINARY-TREE-DEMO. DATA DIVISION. WORKING-STORAGE SECTION. 01 TREE-NODE. 05 NODE-VALUE PIC 9(3). 05 LEFT-CHILD USAGE POINTER VALUE NULL. 05 RIGHT-CHILD USAGE POINTER VALUE NULL. 01 TREE-CONTROL. 05 ROOT-NODE USAGE POINTER VALUE NULL. 05 NEW-NODE USAGE POINTER VALUE NULL. 05 CURRENT-NODE USAGE POINTER VALUE NULL. 05 NODE-VALUES PIC 9(3) OCCURS 7 TIMES. PROCEDURE DIVISION. PERFORM INITIALIZE-TREE-DATA PERFORM BUILD-BINARY-TREE PERFORM TRAVERSE-TREE-INORDER PERFORM CLEANUP-TREE STOP RUN. INITIALIZE-TREE-DATA. MOVE 50 TO NODE-VALUES(1) MOVE 30 TO NODE-VALUES(2) MOVE 70 TO NODE-VALUES(3) MOVE 20 TO NODE-VALUES(4) MOVE 40 TO NODE-VALUES(5) MOVE 60 TO NODE-VALUES(6) MOVE 80 TO NODE-VALUES(7). BUILD-BINARY-TREE. DISPLAY "=== Building Binary Tree ===" PERFORM VARYING CURRENT-NODE FROM 1 BY 1 UNTIL CURRENT-NODE > 7 PERFORM INSERT-NODE INTO TREE USING NODE-VALUES(CURRENT-NODE) END-PERFORM. INSERT-NODE INTO TREE USING VALUE-TO-INSERT. * Allocate new node ALLOCATE LENGTH OF TREE-NODE CHARACTERS RETURNING NEW-NODE ON EXCEPTION DISPLAY "Failed to allocate tree node" EXIT PARAGRAPH NOT ON EXCEPTION MOVE VALUE-TO-INSERT TO NODE-VALUE OF NEW-NODE SET LEFT-CHILD OF NEW-NODE TO NULL SET RIGHT-CHILD OF NEW-NODE TO NULL END-ALLOCATE * Insert into tree IF ROOT-NODE = NULL SET ROOT-NODE TO NEW-NODE DISPLAY "Inserted root node: " VALUE-TO-INSERT ELSE PERFORM INSERT-NODE-RECURSIVE USING ROOT-NODE NEW-NODE END-IF. INSERT-NODE-RECURSIVE USING PARENT-NODE NODE-TO-INSERT. IF NODE-VALUE OF NODE-TO-INSERT < NODE-VALUE OF PARENT-NODE IF LEFT-CHILD OF PARENT-NODE = NULL SET LEFT-CHILD OF PARENT-NODE TO NODE-TO-INSERT DISPLAY "Inserted left child: " NODE-VALUE OF NODE-TO-INSERT ELSE PERFORM INSERT-NODE-RECURSIVE USING LEFT-CHILD OF PARENT-NODE NODE-TO-INSERT END-IF ELSE IF RIGHT-CHILD OF PARENT-NODE = NULL SET RIGHT-CHILD OF PARENT-NODE TO NODE-TO-INSERT DISPLAY "Inserted right child: " NODE-VALUE OF NODE-TO-INSERT ELSE PERFORM INSERT-NODE-RECURSIVE USING RIGHT-CHILD OF PARENT-NODE NODE-TO-INSERT END-IF END-IF. TRAVERSE-TREE-INORDER. DISPLAY "=== Inorder Tree Traversal ===" PERFORM TRAVERSE-INORDER USING ROOT-NODE. TRAVERSE-INORDER USING NODE. IF NODE NOT = NULL PERFORM TRAVERSE-INORDER USING LEFT-CHILD OF NODE DISPLAY "Node value: " NODE-VALUE OF NODE PERFORM TRAVERSE-INORDER USING RIGHT-CHILD OF NODE END-IF. CLEANUP-TREE. DISPLAY "=== Cleaning Up Tree ===" PERFORM CLEANUP-TREE-RECURSIVE USING ROOT-NODE SET ROOT-NODE TO NULL DISPLAY "Tree cleaned up successfully". CLEANUP-TREE-RECURSIVE USING NODE. IF NODE NOT = NULL PERFORM CLEANUP-TREE-RECURSIVE USING LEFT-CHILD OF NODE PERFORM CLEANUP-TREE-RECURSIVE USING RIGHT-CHILD OF NODE FREE NODE END-IF.

Memory Management Best Practices

Effective memory management with based data requires careful planning and implementation to avoid memory leaks and ensure optimal performance.

Memory Management Guidelines

cobol
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
IDENTIFICATION DIVISION. PROGRAM-ID. MEMORY-MANAGEMENT-BEST-PRACTICES. DATA DIVISION. WORKING-STORAGE SECTION. 01 MEMORY-TRACKING. 05 ALLOCATED-BLOCKS PIC 9(4) VALUE ZERO. 05 FREED-BLOCKS PIC 9(4) VALUE ZERO. 05 MEMORY-LEAKS PIC 9(4) VALUE ZERO. 05 MAX-MEMORY-USAGE PIC 9(8) VALUE ZERO. 01 MEMORY-BLOCK. 05 BLOCK-SIZE PIC 9(6). 05 BLOCK-POINTER USAGE POINTER. 05 BLOCK-STATUS PIC X(1) VALUE 'A'. * A=Allocated, F=Freed PROCEDURE DIVISION. DISPLAY "=== Memory Management Best Practices ===" PERFORM DEMONSTRATE-PROPER-ALLOCATION PERFORM DEMONSTRATE-MEMORY-TRACKING PERFORM DEMONSTRATE-LEAK-DETECTION STOP RUN. DEMONSTRATE-PROPER-ALLOCATION. DISPLAY "=== Proper Memory Allocation ===" * Always check allocation success ALLOCATE 1000 CHARACTERS RETURNING BLOCK-POINTER ON EXCEPTION DISPLAY "Allocation failed - insufficient memory" STOP RUN NOT ON EXCEPTION DISPLAY "Memory allocated successfully" ADD 1 TO ALLOCATED-BLOCKS MOVE 1000 TO BLOCK-SIZE END-ALLOCATE * Use allocated memory IF BLOCK-POINTER NOT = NULL DISPLAY "Using allocated memory block" * Perform operations with allocated memory END-IF. DEMONSTRATE-MEMORY-TRACKING. DISPLAY "=== Memory Tracking ===" * Track memory usage ADD BLOCK-SIZE TO MAX-MEMORY-USAGE DISPLAY "Current memory usage: " MAX-MEMORY-USAGE " bytes" DISPLAY "Allocated blocks: " ALLOCATED-BLOCKS DISPLAY "Freed blocks: " FREED-BLOCKS. DEMONSTRATE-LEAK-DETECTION. DISPLAY "=== Memory Leak Detection ===" * Proper cleanup IF BLOCK-POINTER NOT = NULL FREE BLOCK-POINTER DISPLAY "Memory block freed" ADD 1 TO FREED-BLOCKS SET BLOCK-POINTER TO NULL MOVE 'F' TO BLOCK-STATUS END-IF * Check for leaks COMPUTE MEMORY-LEAKS = ALLOCATED-BLOCKS - FREED-BLOCKS IF MEMORY-LEAKS > 0 DISPLAY "WARNING: " MEMORY-LEAKS " memory leaks detected" ELSE DISPLAY "No memory leaks detected" END-IF.

Performance Considerations

Based data operations have performance implications that must be considered when designing applications.

Performance Optimization Techniques

cobol
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
IDENTIFICATION DIVISION. PROGRAM-ID. PERFORMANCE-OPTIMIZATION-DEMO. DATA DIVISION. WORKING-STORAGE SECTION. 01 PERFORMANCE-METRICS. 05 ALLOCATION-TIME PIC 9(6) VALUE ZERO. 05 ACCESS-TIME PIC 9(6) VALUE ZERO. 05 TOTAL-TIME PIC 9(6) VALUE ZERO. 05 OPERATION-COUNT PIC 9(4) VALUE 1000. 01 OPTIMIZED-DATA. 05 DATA-POOL USAGE POINTER OCCURS 100 TIMES. 05 POOL-SIZE PIC 9(3) VALUE 100. 05 POOL-INDEX PIC 9(3) VALUE ZERO. PROCEDURE DIVISION. DISPLAY "=== Performance Optimization Demo ===" PERFORM INITIALIZE-MEMORY-POOL PERFORM DEMONSTRATE-POOL-ALLOCATION PERFORM DEMONSTRATE-BATCH-OPERATIONS PERFORM CLEANUP-MEMORY-POOL STOP RUN. INITIALIZE-MEMORY-POOL. DISPLAY "=== Memory Pool Initialization ===" * Pre-allocate memory pool for better performance PERFORM VARYING POOL-INDEX FROM 1 BY 1 UNTIL POOL-INDEX > POOL-SIZE ALLOCATE 100 CHARACTERS RETURNING DATA-POOL(POOL-INDEX) ON EXCEPTION DISPLAY "Pool allocation failed at index " POOL-INDEX EXIT PERFORM NOT ON EXCEPTION CONTINUE END-ALLOCATE END-PERFORM DISPLAY "Memory pool initialized with " POOL-SIZE " blocks". DEMONSTRATE-POOL-ALLOCATION. DISPLAY "=== Pool-Based Allocation ===" * Use pre-allocated blocks for better performance PERFORM VARYING POOL-INDEX FROM 1 BY 1 UNTIL POOL-INDEX > 10 IF DATA-POOL(POOL-INDEX) NOT = NULL DISPLAY "Using pre-allocated block " POOL-INDEX * Perform operations with allocated block END-IF END-PERFORM. DEMONSTRATE-BATCH-OPERATIONS. DISPLAY "=== Batch Operations ===" * Batch allocate for better performance PERFORM VARYING POOL-INDEX FROM 1 BY 1 UNTIL POOL-INDEX > 50 * Simulate batch processing CONTINUE END-PERFORM DISPLAY "Batch operations completed". CLEANUP-MEMORY-POOL. DISPLAY "=== Memory Pool Cleanup ===" * Clean up all allocated blocks PERFORM VARYING POOL-INDEX FROM 1 BY 1 UNTIL POOL-INDEX > POOL-SIZE IF DATA-POOL(POOL-INDEX) NOT = NULL FREE DATA-POOL(POOL-INDEX) SET DATA-POOL(POOL-INDEX) TO NULL END-IF END-PERFORM DISPLAY "Memory pool cleaned up successfully".

Best Practices for Based Data

Following best practices ensures reliable, efficient, and maintainable based data implementations.

Design Principles

  • Always initialize pointers to NULL
  • Check for NULL pointers before dereferencing
  • Implement proper error handling for allocation failures
  • Use memory pools for high-frequency allocations
  • Implement comprehensive cleanup procedures

Implementation Guidelines

  • Track all allocated memory blocks
  • Implement memory leak detection
  • Use appropriate data structures for the problem
  • Consider cache locality in data organization
  • Profile memory usage patterns

Debugging and Maintenance

  • Implement memory debugging tools
  • Use consistent naming conventions for pointers
  • Document memory ownership and lifecycle
  • Regular testing for memory leaks
  • Performance monitoring and optimization

FAQ

What is based data in COBOL?

Based data in COBOL refers to data items that are dynamically allocated in memory using pointers or addresses. It allows for flexible memory management and dynamic data structures that can grow or shrink as needed during program execution.

How do you use pointers in COBOL?

Pointers in COBOL are implemented using USAGE POINTER clauses and ADDRESS OF functions. They allow programs to reference memory locations dynamically and create linked data structures for efficient memory management.

What are the benefits of based data in COBOL?

Benefits include dynamic memory allocation, efficient memory usage, flexible data structures, support for linked lists and trees, reduced memory waste, and the ability to handle variable-size data efficiently.

How do you implement dynamic memory allocation in COBOL?

Dynamic memory allocation is implemented using ALLOCATE and FREE statements with pointer variables. This allows programs to request memory at runtime and release it when no longer needed, similar to malloc/free in C.

What are the performance considerations for based data?

Performance considerations include pointer dereferencing overhead, memory fragmentation, garbage collection needs, cache locality effects, and the trade-off between flexibility and performance. Proper design can minimize these impacts.